Hoover Dam Workers

Before the Dam could be built the Colorado River had to be diverted through tunnels. This piece of equipment, named a Jumbo Rig, was designed to speed up the tunnel drilling process. Built on the back of a 10-ton truck, 24 to 30 drills could be operated at once. (Department of Interior Bureau of Reclamation)